Concept:The total production/prime cost is found by adding all direct production costs: raw materials consumed, manufacturing wages, and direct expenses.Explanation:Cost of raw material consumed is the direct material cost.Manufacturing wages are the direct labour cost.Direct expenses are the other direct charges incurred in production.Therefore, total production cost =Cost of raw materials consumed+Manufacturing wages+Direct expenses.Using the given figures, the total production cost is ₦220,480.Answer:Option A: ₦220,480.