The Average Cost is the per unit cost of production obtained by dividing the total cost (TC) by the total output (Q). Thus we have; Average cost = Total cost ÷ Total output(quantity)
Total cost = fixed cost + variable cost
Average cost = 500 + 1500 ÷ 50 2000 ÷ 50 = 40