Let x rep. numbers of boys that can work at 54\frac{5}{4}45 the rate at
which the 10 girls work
For 1 hrs, x boys will work for 15×104\frac{\frac{1}{5} \times 10}{4}451×10
x = 54\frac{5}{4}45 x 10
= 8 boys
8 boys will do the work of ten girls at the same rate
4 + 8 = 12 bous cut the field in 5 hrs for 3 hrs,
12×53\frac{12 \times 5}{3}312×5 boys will be needed = 20 boys.